Primoris Power Solutions to Perform LiDAR Survey
Primoris Power Solutions (PPS) has been contracted by ETEC to perform both a LiDAR survey and a foot patrol on the E Burges to Henry Edgar line section for ETEC’s Insulator Replacement Project efforts that will be under construction next year. Primoris is planning to perform the LiDAR survey with the use of a drone and will have boots on the ground doing the ground patrol at the same time as the aerial patrol. Primoris is planning to divide this work into three legs and complete the work over three days. Details are below:
Leg 1 – 9/23/2025
Beginning: Henry Edgar Substation
Ending: STR. 23
Leg 2 – 9/24/2025
Beginning: STR. 23
Ending: STR. 54
Leg 3 – 9/23/2025
Beginning: STR. 54
Ending: E Burges Substation